gallery page title image
close the window to return to gallery


Topsoil cleared from the wetland area.

Topsoil was cleared from the full flood area by the end of Day 2. Some topsoil was cleared to be sold and that from the base of the bank was stored to re-cover the bank after it was formed. Topsoil was removed to the depth of the sub-soil. The only area that clay was exposed was in the 'borrow area' at the foot of the bank.






This site developed and maintained by Ian Wright.

Last updated on Monday, June 18, 2012 07:16PM.